Homepage | Set Home | Add to Favorites
Member

Hebei Mortmain Rubber and Plastic Technology Co., Ltd


Products
  • No Category
Search
 

Friends links

Plastic Plywood formwork
Click image to view full size image
Product: Views:114Plastic Plywood formwork 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2020-12-14 06:17
  Inquiry
Details

Thickness(mm)

Length*Width(mm)

Weight(kg)

12

1220*2440

22-23

15

1220*2440

26-27

16

1220*2440

28-29

18

1220*2440

32-33


The comparison between plastic formwork and aluminium formwork

1, The aluminum alloy template must be used in standard high rise buildings, in order to reduce the use of costs (construction of a single building below 30 floors is not suggested, only if the phased construction);

2, Every thing must be very accurate whether in the design, or the needs of the owners of the structural drawings and construction drawings if using aluminum alloy template; in addition, size can not be modified; ( while plastic formwrk can be cut according to the need. )

3, One-time investment is high, very expensive.

4, The surface of concrete and aluminum will play a chemical reaction and the plate will not be smooth after several times. small bubbles appear.

5, Aluminum template is not available for the basement construction.

http://www.mtmformwork.com/

Inquiry